Plan Early for LEED Commissioning

Lessons learned from a recent LEED commissioning audit

Part and parcel of winning a U.S. Green Building Council LEED certification is the auditing of submittal materials to ensure compliance with certification requirements. Unlike an IRS audit, this doesn’t have to be a heartache.

Certification is evaluated on a point system based on a total of 69 possible points and seven mandatory prerequisites. The owner and design team can choose the strategies they want to include in the building to achieve the points required for certification