Latest from Piping / Pumping

Charlotte Pipe and Foundry Co.
Viega
Charlotte Pipe and Foundry
Screenshot 2023 10 30 125004
Screenshot 2023 10 30 125004
Screenshot 2023 10 30 125004
Screenshot 2023 10 30 125004
Screenshot 2023 10 30 125004
HPAC Engineering
F7 K7z6 Sb0 Aaa7 1
F7 K7z6 Sb0 Aaa7 1
F7 K7z6 Sb0 Aaa7 1
F7 K7z6 Sb0 Aaa7 1
F7 K7z6 Sb0 Aaa7 1
iStock
Istockphoto 1235495974 612x612
Istockphoto 1235495974 612x612
Istockphoto 1235495974 612x612
Istockphoto 1235495974 612x612
Istockphoto 1235495974 612x612
Hpac 504 Makeitworkfig1
Hpac 504 Makeitworkfig1
Hpac 504 Makeitworkfig1
Hpac 504 Makeitworkfig1
Hpac 504 Makeitworkfig1

Make It Work!

May 1, 2009
While working for a contractor overseas about 25 years ago, I often was required to manage construction projects at remote locations. Considering the

While working for a contractor overseas about 25 years ago, I often was required to manage construction projects at remote locations. Considering the time it generally took prefabricated and preassembled systems to arrive on-site, this often necessitated on-site fabrication of tees for piping systems with welded joints.

Straight lengths of pipes of different diameters usually were never in short supply at a project site. However, fittings with specific-size tees for different combinations of pipe diameters usually were. In those instances, engineering basics came to the rescue.

The only information needed to field-fabricate a tee connection was the outer diameter of the pipes to be connected — for example, 6 in. by 3 in. I then used a drafting technique called “development of surfaces,” which involved developing a near-exact curve/profile, such as what one would expect to see on the surface of a 6-in. pipe connected to a 3-in. pipe. I also developed another curve/profile that represented the curvature on the end of the 3-in. pipe when connected to the surface of the 6-in. pipe. These two developed surfaces then constituted the “set” for preparation of a 6-in.-by-3-in. tee (figures 1, 2, and 3).

Once the profiles were developed, I wrapped the 6-in.-diameter developed surface on the 6-in. pipe and marked the profile on the pipe (Figure 2). I did the same with the 3-in.-diameter developed surface (Figure 3). The pipes then were cut as per the marked contour. The cut edges were ground for a proper finish/fit, which is similar to how surfaces are prepared for welding.

Once I prepared the contour sheet sets for the various pipe combinations, field-fabricating the tees was effective and no different than putting together a routine welded pipe joint. This technique proved to be particularly cost-effective for large-diameter (greater than 2 in.) pipes.
Asif Kadiani, PE, CEM, LEED AP
Hanson Professional Services Inc.
Springfield, Ill.